This winter holiday season, give a precious gift to your career by upgrading your skills. | Get Flat 15 - 20% OFF on All Courses | Save Today

[iqquestion id=58]

26 thoughts on “Manual Testing : SDLC Discussion 3

  • ranjan

    sdlc phases are initial phase, design phase, coding phase, testing, delivery phase.

  • karim

    1- Requirement phase:
    BA and managers will talk to customer and
    Gathering information.
    2- DEFINE PHASE:
    Requirement will be taken to review and
    software Requirement Specification will
    be created.
    3- Design Phase:
    System software engineering will design
    structure of the solution.
    4- DEVELOPMENT:
    Developer will develop the software and
    will test a unit test the software will
    go to QA.
    5- TESTING PHASE:
    Tester in QA will test the software and
    if they find any defect,defect report
    will be filed and sends to be fixed by
    developers. If did not find defect it
    will go to operation.
    6- DEPLOYMENT (operation):
    software will be put on server and will
    be released for use in market.

  • Dinesh Kumar

    STLC stands for Software Devlopment Life Cycle. Software testing include below steps –
    1. Requirement Gathering
    2. Analysis
    3. Test Plan
    4. Test Designing
    5. Test Environment
    6. Execution
    7. Test Reporting

  • collins

    The various phases of software development life cyle are requirement analysis, define requirment, designing, building, and testing, deployment in the market

    Requirment gathering-it is done by the senior members with input from customer

    Define Requirments- this is the software requriement specification which consist of all the product requirement
    Design The Product- is determine what is needed to make the product
    Developing the Product- this is done by the developers
    Test The Product-done by the testers
    Deployment in the Market- product is ready to be send to the market

  • Olubunmi Ogunsola

    Software Development Life Cycle.

    Requirement Analysis – BA interacts with customer to establish needs and feasibility.

    Define Requirement – SRS will be created and requirements will be reviewed.

    Designing – Software developers will construct how the product will need to be

    Building – Developers will create the product

    Testing – The testers will test aspects of the product and determine if there are any defects

    Deployment – The product will be ready for deployment into the market

    Maintenance – The product will be checked to make sure it stays up to par with specified requirements

    – Tomiwa

  • Jomon Elengical

    1. Planning and requirement analysis. This is done by the senior members of the team with inputs from the customer, market surveys etc.
    2. Define requirement- done by BA/ PM. This clearly define and document the product requirements and get them approved from the customer. This is done through SRS.
    3. Design- done by developer. Based on the requirement in SRS product architecture is designed.
    4. Develop/ implement- done by developer. It is coding. In this stage the actual product is built based on design.
    5. Test- done by the QA. In this stage, product defects are reported, tracked, fixed and retested, until the product reaches the quality standards defined in the SRS.
    6. Debugging- done by the developer
    7. Deploy/ evolution- done by operations. It is the maintenance and evolution of the system. Once the product is tested and ready to be deployed it is released formally in the appropriate market.

  • sivi ramesh

    Different phase of SDLC:
    Requirement Gathering: Business requirements are gathered in this phase. D
    Design Phase: Technical architect works for the high level & low design of the software. Business analyst works for the UI design of the application
    Coding phase: Developers develop the code according to the business requirements
    Testing phase:Actual tesing is done in the testing phase.
    Deployment: Application is developed on the production environment to the real end users

  • skaur

    Various phases of SDLC:
    Requirement Analysis: In this phase, requirements are being created.
    Designing: Business Analysts design what the product will look like.
    Development: Developers will create the product by coding/programming.
    Testing: Product will undergo multiple testing phases
    Deployment/Evolution: In this phase, product will
    undergo maintenance and evolution

  • Pamela halbhavi

    Each company have their own phases of SDLC. Here are the most common phases of SDLC –

    Initiation: The purpose of initiation is to get a rough cut at the business case for a proposed IT Project

    Planning: Planning involves Quality assurance planning, feasibility study to describe various technical approaches to implement the projects and Risk Management plan to identify the risks associated with the projects.

    Requirement Analysis : During analysis , the detailed requirements are elicited by the Business Analysts, then analyzed and documented for verification by stakeholders and for the use by the developers

    Design : Transforms detailed requirements into complete detailed system design document. Focuses on how to deliver the required functionality.

    Development: Converts the design document into workable code, compiled , refined and test readied. Includes installing the system environment, creating and testing databases. Preparing test case procedures and Performing test readiness review.

    Testing: This stage of testing, product defects are reported, tracked, fixed and retested, until the product reaches the quality standards proposed in the SRS. Produces Test Analysis reports.

    Deployment and Maintenance: Once is the product is tested and ready to be deployed, it is released . After that most of tasks involve operations and maintaining the system in a production environment.

  • smriti

    Planning- It is done by the executives of the company. They plan, analyze and weigh the risks of the project. They make a collective decision on contingency of the project and then pass it on to the other departments to carry on the project.

    Defining requirements: This is done by the Business Analysts department. They collect the requirements from the customer for whom the product is being built and write requirements for the product using SRS. They also have to get it approved by the customer or market analysts.

    Designing the product: After getting the requirements, the design team make more than one design approach for the product and document it.

    Development: The developers start to build the product. They start generating codes using several programming tools and programming languages.

    Testing: The testers test the product to see if the product is ready and working. They track and report any defects, get it fixed and then re-test it until it meets all the requirements on the SRS.

    Deployment: After the product is thoroughly tested and ready to be deployed into the market, it is put on the servers and then released.

  • arsalan

    Phases of SDLC:

    1. Planning:PMs meet with the customer to get the requirement and discuss the planing.

    2. Defining: BA starting breaking down the requirement as Functional Requirement document.

    3. Design:Developers start coding.

    4. Testing:Testers start testing

    5. Deployment:Project will be delivered to the customer

  • Arif kazi

    various phases of SDLC are
    1.planning and requirement analysis
    2.define requirement
    3.designing the product architecture
    4.developing
    5.testing
    6.deployment
    details explain
    Planning and requirement analysis: it is the most important stage. this is done by the senior member of the team. Information gathered in this phase.
    Define requirement: Its done by business analysts.This clearly define and document the product requirement and get them approved from the customer.

  • Arif kazi

    various phase of SDLC are
    1.planning and requirement analysis
    2.define requirement
    3.designing the product architecture
    4.developing
    5.testing
    6.deployment
    details explain
    Planning and requirement analysis: it is the most important stage. this is done by the senior member of the team. Information gathered in this phase.
    Define requirement: Its done by business analysts.This clearly define and document the product requirement and get them approved from the customer.
    Designing the product architecture: Product are designed in this phase. Developers designed how the product will need to be.
    Development: developer will create the product with coding.
    Testing: testers test the software troughly for different errors by forming various test cases.
    Deployment: This is the final stage of SDLC.In this stage the product is formally relased in the appropriate market.

  • Mumtaz Ali

    1. Planing and Requirement Phase:
    BA and manager will talk to customer and gather information.
    2. Defining Requirement:
    Requirement will be reviewed and software requirement will be created.
    3. Design Phase:
    System software engineer will design structure of the solution.
    4. Building or developing the product
    Developer will develop the software and do unit testing and then will be forwarded to QA.
    5. Testing the product:
    QA will test the software and if they find any defect the a defect report will be filed and send to be fixed by developers.
    6. Deployment in the Market:
    Software will be put on the server and will be deployed for use in the market

  • krishna shrestha

    The various phases of SDLC are Planning, defining, designing, testing, deploy.
    Planning : it calls executive group like that CEO, CTO, VP,CFO makes senior peoples and It works generating the idea (requirement) or create the idea from customer side about the project . this group knows everything and everyone and leading to all departments so It done by very senior peoples.
    Defining : it calls business analysis (BA). It works, what is the customer wants . this department brings the customer requirement or translate idea into requirement . when this department bring the requirement then move to design group for making the design of application . it done by Business analysis.
    Design : it called technical group, software development, create solution, development group. after done of the BA work then this department will start the works. BA explain the customer requirement to design group for application and this department makes the development or design of software application with customer prospectus and used coding too. It done by developer.
    QA(Quality Assurance) : it called software testing group, validate solution. When the design group done their work then they send the application to QA for bug test so it department works only find out the bugs, mistakes, errors in the software applications. If the tester find out any bugs in application then they send to design group for fix the application again . when tester done their work . they send the application to operational group. It done by tester .
    Deploy : it calls operation group. It has help desk, analysis systematic, data base admin, security group too . each department works different . for exe. Help desk will install the software in customer machine . data base admin will work about data. Security group will work about security systems . system admin will work server . The quality assurance done their work then the software application is ready for use by customer so the operational group works released the software to use by customer and solved the verity problem. It done by operational group .

  • Meena Mustafa

    The various phases of SDLC are:
    Initiate
    Define
    Design
    Coding
    Testing
    Deployment.
    In the initiate phase planning is done followed by the requirements that fall in the define phase which is documented in BRD and FRD. Then in the design phase the software is designed as to how it will be when the final product is out in the market.All the information is again documented in the BRD and FRD and reviewed.
    Then comes the coding which is done by the developers through unit testing(White Box testing).After the coding is done it goes to the QA team for testing to make sure that the product is bug free.If there are any defects they are documented and passed on the developers to fix. Once the software is fixed it is then ready to be deployed which completes the cycle.

  • bruno

    SDLC is a framework that consist the followings;
    – Planning requirement involved senior member and the clients in order to collect data.
    – Defining after collecting data requirement those requirement will be initiated in Software Requirement Document.
    – Designing with help the of Archirtech to develop Design Requirement Document.
    – Building in this phase the software will develop.
    – Test in this phase the program will be test, verify and validated.
    – Deployment in this phase the software will be ready to be release to the stakeholder.

  • Betty Moyler

    Planing and Requirement Phase:
    BA and manager will talk to customer and gather information.
    2. Defining Requirement:
    Requirement will be reviewed and software requirement will be created.
    3. Design Phase:
    System software engineer will design structure of the solution.
    4. Building or developing the product
    Developer will develop the software and do unit testing and then will be forwarded to QA.
    5. Testing the product:
    QA will test the software and if they find any defect the a defect report will be filed and send to be fixed by developers.
    6. Deployment in the Market:
    Software will be put on the server and will be deployed for use in the market

  • Banksy

    SDLC is the following:

    Planning and Requirements Phase:
    Top management and the BA gather information from the needs of the customer, while developing the requirements that will be needed to produce and deploy this product, including the risk involved

    Defining Requirements: In this phase the Software begins to take shape in terms of design by gathering what will be required to accomplish the needs of the End Users

    Building and Developing: The Developers begin developing the application based on the company standards and Software requirements needed

    Testing product: this involves continued testing by the developers and QA Testers to determine defects, may also include a UAT phase or User Testing Phase to make sure the application functions as expected for the requirements of the User

    Deployment Phase: Software deployed to the End User via SCCM or Virtually or Manually depending on the number of user that will need the application and if the installation is simple or complex

  • swissqb

    Planning – Done by CEO, CIO of a company outline a requirement

    Defining – The requirements of the product is documented. Then put into a SRS

    Design – Design approaches are proposed.
    The best one is chosen

    Building – Coding begins by the develpoers

    Testing – defects are tracked,reported and fixed

    Deployment – Product is released. sometime on a limited basis.

  • andrew

    There are six steps,

    1.Requirement-BA establish needs
    2.Define -review specification
    3.Designing- software engineering
    4 Building- by developers
    5.testing- QA
    6.Deployment- product ready for market

  • Wahabu

    SDLC have 5 phases, which are;
    1)Idea(s) generation stage: The ideas are generated by executives of the company mostly through customers in other to satisfy their needs.
    2) Software requirement stage: after the idea has been generated, the BA unit analyzed the ideas and come out with requirements to satisfy those ideas
    3) Design Stage: Developers come out with the architecture design of the requirement
    4) Build up stage: After the software design, developers then come out with codes to build the software in accordance with the requirements.
    5) Testing stage: At this stage, Testers test to make sure that the application is bug free to better satisfy the end user
    6) Deployment stage: The Operations department will then deploy the software if it’s satisfied of being ok for the end user.

  • ssanon

    Software Development Life Cycle or SDLC is the process in which a product undergoes to reach the client satisfaction, The process includes:

    Planning: which involves planning with client the basic plan or apporach to the software project.

    Defining which involves stating the Software Requirement Specifications (SRS) to be designed and developed in the projects life cycle.

    Designing involves structuring the layout or design of the project.

    Building which is when the actual products is designed and Developers generate codes for the software project

    Testing involves testing detecting, reporting, and fixing defects to reach the criteria of the project decided in the SRS

    Deployment is when the product as reached the SRS and client expectations and is ready to be presented on the market.

  • Shirin Safire

    SDLC is the acronym of Software Development Life Cycle. SDLC is a process used by software company to design, develop and test high quality software. SDLC is the steps to develop and maintain, replace and alter specific software. Using this life cycle methodology improve the quality of software and overall development process.

    1.Planning or requirement analysis. (By Executive of Marketing)
    The requirement gathering is the most important part to SDLC. It is performed by executive member of the company with input from customers, sale department, marketing surveys
    2.Defining or documenting the requirement. (By BA)
    The next step after planning the requirement is defining and documenting the requirement and get it approve by customer of market analysis. This part is being done by BA (business analyst)
    3.Designing the product architecture (By developer)
    Software developers will construct how the product will need to be. Transforms detailed requirements into complete detailed system design document. Focuses on how to deliver the required functionality.
    4.Building or code development (By developer)
    Developer will be coding and creating the product based on the requirement and product design document.
    5. Testing (By QA)
    In this stage, the testers are actually testing the product based on the requirement doc. And defects are reported, tracked, fixed and retested, until the product reaches the quality standards defined in the SRS.
    6.Deployment (By IT operation group)
    Once the product is tested and ready to be deployed it is released formally in the appropriate market.

  • Solomon Ayanaw Habtu

    SDLC stands for Software development Life Cycle. It is a standard to develop a software in a quality way.
    SDLC has the following life cycles:

    Requirement Analysis and Specification: done by BR and high level officials with System Owner to decide functionalities to be included in the system.

    System Analysis and Design: in this phase based on the requirement developers design the system. It includes Use case diagram, high level design(how modules interact each other), Low level design(psedocode, flowchart of each module).

    Codding phase: writing the actual code using programming language

    Testing: Even-though testing starts from early stage, at this testing phase it is thought that the software is developed and ready to go for deployment. So before going to deployed the last integration and beta test, User acceptance test will be done here.

    Deployment: that version software will be released to the market/owner

    Maintaining: at his phase if the system crashes any time while working, any maintenance will be done on it.

  • Charchika Ailavajjala

    SDLC is the process to develop a design, develop and test a high quality software product used by the software industries and release into the market all at once or in parts with latest enhancements and improvements in the software, in the given time line and estimated budget.

    There are different phases in SDLC starting with
    1 Requirement Gathering and analysis: When attending the meetings gathering requirements collecting and note down all the important aspects of the requirements phase.
    2.Design: All the experts sit and create a SRS documents extracted from the customer requirements, sales, marketing, SME, Architects ect.. will create a DDS(Design Document specification).
    3.Coding: With reference to the SRS and DDS the developers will develop the software
    4. Testers: The main role of the tester is not only finding defects, but also he puts himself in the shoes of the end-user and replicated whole entire scenario like the end user.
    5.Maintenance: Release the software and enhance if needed.

    For example: If we are planning to go to a vacation. Step1: We will plan Where to go
    Gathering requirements : How many ways can we go: by bus , by car, by train, by flight
    Design: when we are booking for the routes: we will look for non stop, low price comfortable shortest distance, all these considering we will design and book the tickets.
    Execution: We will now hold the requirements like: tickets and itinerary and try to execute the plan as per specified in the tickets and itinerary.(STLC )
    Developers: would do coding at this stage and testers would to test execution at this stage.
    Report: Report what went wrong in the defect report monitor and see to it that all the critical bugs are fixed and Repot how many TC are successfully executed for traceablity.
    Deployment: in the deployment phase release the software to the market and take the customer feedback. Make enhancements in the new releases if required.

Leave a Reply