5 thoughts on “Manual Testing : Defect Management Discussion 5

  • Olubunmi Ogunsola

    defect is found and labeled as NEW, program manager analyzes it and makes sure it’s valid, after manager checks for duplicate defect from past, if so, it is labeled duplicate, if not the defect is handed to a developer to be fixed and labeled IN PROGRESS, after it is fixed it will be labeled FIXED, then it will be checked again to make sure it is fixed, if it is it is labeled CLOSED, if not labeled REOPEN
    -Tomiwa

  • Jomon Elengical

    Defect lifecycle is a cycle which a defect goes through during its lifetime. It starts when defect is found and ends when a defect is closed after ensuring its not reproduced or rejected .
    – jyothi

  • collins

    the defect life cycle is the process of finding the defects and reporting it to get fix and seeing if the defect is closed

  • skaur

    Defect found- status = new
    Defect analyzed be developers – status = in progres
    If valid- defect fixed
    Tester retest – Status = closed if test pass, Status = reopen if test failed

  • Solomon Ayanaw Habtu

    Defect life cycle is a flow or procedure that the defect passes through from the time the defect is raised till it is fixed and closed time.